Turn-Key Project for ZwickRoell at Cambridge University
See how we delivered and positioned a 36-tonne ZwickRoell 2.5MN test frame and bending table for Cambridge University’s new Civil Engineering test facility.
See how we delivered and positioned a 36-tonne ZwickRoell 2.5MN test frame and bending table for Cambridge University’s new Civil Engineering test facility.
These boilers generate the hot water for the heating and wash facilities and for the under soil heating at Ashton Gate.
QML were tasked with delivering new Hoval boilers to the service basement at Windsor Castle and removing the old boilers.
QML utilised the electric Power Attack load mover for propulsion.
Our assignment involved the removal and transportation of a new 300t capacity press from the manufacturer.
This topping and tailing of a cyclone unit was done at one of our clients premises using APH Crane Hire for the main lift and our Hiab as the tailing crane.