Here is a snap shot of a few projects we have been involved in.

  • Moving high quality test equipment into various test facilities including Renault F1 and Warwick University in their state of the art facilities
  • Moving up 27m and down 32m allowing for the positioning 8t waste grabs in an Energy from Waste facility using an air winch suspended from an out of use overhead crane
  • Various CNC moves.
  • Lowering a Mini convertible 3 floors down from ground floor to allow for the new display in M&M World, Leicester Square over Christmas.
  • Positioning literally 100’s of electrical cabinets in many locations around the country.